ROAD CLOSURE ST. PETERS MAIN ROAD
“St. Peters House Connection and Trench Re-construction”
The Ministry of VROMI would like to inform the general public of St. Maarten and the residents of St. Peters of the following:
As of Friday September 30th 2016, the entrance to the St. Peters main Road, from the L.B. Scott road, will be closed during the week-end for the next 3 weeks, the entrance to the Cupper drive will also be closed during the week of the school break from September 30th 2016 until October 10th 2016, to enable the Contractor Designer’s Choice N.V. to connect the St. Peters road main sewage line and Cupper drive onto the existing sewage line in the L.B. Scott road.
The execution of the works will commence Friday evening at 9:00 pm with the closure of the St. Peters main road and Cupper drive. During the execution of the works, residence residing on the St. Peters main road will have access to their homes by means of a detour via the Messaple road. Cupper drive will be completely closed from all traffic.
During the execution of the project the detour from St. Peters to L.B. Scott road and vice versa will be directed thru the Mesapple road . Marigot Hill road will remain a one way road to the L.B. Scott road as present situation.
The overall objective of the project is to connect the homes alongside the main road of St. Peters and Cupper drive onto the main sewage line in the L.B. Scott road that will further transport the waste water to the Waste Water Treatment Plant, located at the A.T. illidge road.
With the connecting of the homes onto the main sewerage lines, the existing issues of running sewerage water on the main road of St. Peters will be eliminated and will be something of the past.
During the execution of the project the residents of St. Peters and Motorists that utilize the St. Peters road and the L.B. Scott Road will experience some inconvenience.
Further information about the Project “St. Peters house connection” can be obtained at Ministry of VROMI, Department of New Projects Development and Planning, tel. 542-4289, Project Manager, ing. Bako Maynard, email: bako.maynard@sintmaartengov.org and/or Department Head New Projects Development and Planning, ing. Kurt A. Ruan, e-mail: kurt.ruan@sintmaartengov.org